Hooke Park Big Shed is a new workshop building designed by the Architectural Association Design & Make students. Located in Dorset, England, the workshop building was constructed by using prototypical techniques developed after testing in the material science laboratory at Bath University with a team put together by Charley Brentnall. The students, who were supervised by then-executive architect, Piers Taylor, also used material extracted from the Hooke woodland.
Hooke Park Big Shed
Pin
Hooke Park Big Shed functions as a new sheltered workspace for build activities of the Design & Make program.
Pin
But now it has been used for full-scale prototyping, pre-assembly, testing, and other researchers into architectural systems.
Pin
In the future, the building’s core output will be a series of student-designed-and-built campus buildings.
The Building Structure
Pin
Engineered by consultants Atelier One, the building structure used the high-capacity screwed connections equipped with large round-wood trusses.
Pin
Developed through the testing collaboration with Bath University, such approach allows trees to be used ‘in-the-round’ in complex structures with no major engineering processing.
Pin
It also showcases an approach to building that optimizes the use of local resources while minimizing reliance on industrial production of building components.
The Use of Un-Regularized Larch Roundwood
Pin
The use of un-regularized larch Roundwood was necessary for the main structure due to its good durability and current availability.
Pin
It also enables to prevent the spread of Phytophthora in South West England. Meanwhile, the wall panels are clad with red cedar boarding sized 30mm thick and 100mm wide.
Pin
The boarding was sawn from around 30 fallen trees at Hooke Park.
The Trusses Fabrication Process
Pin
The trusses fabrication was conducted by a team consisted of students from Design & Make as well as summer volunteers on the AA’s ‘SummerBuild’ program at Hooke Park.
Pin
Each planner truss was horizontally assembled and fabricated before being lifted into position the concrete slab of the building.
Pin
Most of the truss connections utilize the sets of 400mm-long Heco Topix screws at cross-angles through each joint.
Maximize the Use of Trees
Pin
A complexity was found on how to properly match the varying tree’s trunk to the differing structural performance requirements in the structure.
Pin
However, by mapping the engineer’s analysis-derived forces onto the building’s structure, the natural variations in taper, quality, diameter, and straightness were considered thoroughly so that each tree can be used optimally in the building.
Via Invisible Studio
Get gorgeous projects via email
















Leave a Reply
View Comments